The Burrington Group

Civil Engineering | Land Surveying

  • Home
  • About
  • Portfolio
  • Services
  • Staff
You are here: Home / Portfolio / Street Improvements

Street Improvements

May 29, 2014 by itsadmin

Central City, Iowa

The 2009 project included paving of 2nd and 3rd Street from Barber Street to Grove Street, along with water main replacement, sidewalk and drainage improvements.  The six inch concrete pavement totaled 3,200 square yards.   With this area being just south of the high school, a 41 foot concrete pavement provided adequate width for parallel parking on both sides.

Before
After

Before
After

Filed Under: Portfolio

Contact Us:

Burrington Group
105 West Main St.
Manchester, IA 52057
(563) 927-2434
info@burringtongroup.com

Featured Projects

Street Improvements

Jacoby Walkway

View Our Portfolio

Contact Us:

Burrington Group
105 West Main St.
Manchester, IA 52057
(563) 927-2434
info@burringtongroup.com

Find Us:

Search This Website:

© Copyright 2016 Burrington Group · All Rights Reserved · Powered by ITS · Login