The Burrington Group

Civil Engineering | Land Surveying

  • Home
  • About
  • Portfolio
  • Services
  • Staff
You are here: Home / Archives for itsadmin

Project 2

May 30, 2014 by itsadmin

Lorem ipsum dolor sit amet, salutatus instructior mei ad, per aeterno mediocrem prodesset ut. Wisi aliquid vim te, ei mei elit consequat, et quis atomorum pro. Sit sanctus propriae te. Corpora petentium intellegat nam ne, in movet commune definitiones eos.

His denique epicurei periculis eu, eu dicunt luptatum assueverit vix. Verear voluptatibus ius eu, eum possim deleniti consulatu ad. Te has clita qualisque, eam odio atqui laudem an. Vix te malis mollis timeam, cu detracto persecuti ius, in lorem volutpat gloriatur nam. Qui minim corpora ocurreret cu, minim electram suscipiantur ad eos, ad duo elit deserunt persequeris.

Link to download document

Link to download document

Link to download document

Link to download document

Filed Under: Projects

Project 1

May 30, 2014 by itsadmin

Lorem ipsum dolor sit amet, salutatus instructior mei ad, per aeterno mediocrem prodesset ut. Wisi aliquid vim te, ei mei elit consequat, et quis atomorum pro. Sit sanctus propriae te. Corpora petentium intellegat nam ne, in movet commune definitiones eos.

His denique epicurei periculis eu, eu dicunt luptatum assueverit vix. Verear voluptatibus ius eu, eum possim deleniti consulatu ad. Te has clita qualisque, eam odio atqui laudem an. Vix te malis mollis timeam, cu detracto persecuti ius, in lorem volutpat gloriatur nam. Qui minim corpora ocurreret cu, minim electram suscipiantur ad eos, ad duo elit deserunt persequeris.

Filed Under: Projects

Street Improvements

May 29, 2014 by itsadmin

Central City, Iowa

The 2009 project included paving of 2nd and 3rd Street from Barber Street to Grove Street, along with water main replacement, sidewalk and drainage improvements.  The six inch concrete pavement totaled 3,200 square yards.   With this area being just south of the high school, a 41 foot concrete pavement provided adequate width for parallel parking on both sides.

Before
After

Before
After

Filed Under: Portfolio

Jacoby Walkway

May 29, 2014 by itsadmin

Epworth, Iowa

The City constructed a mile long, 8 foot wide concrete trail along the north side of Jacoby Drive in 2002.  The 5” concrete walkway included about 4,600 square yards of pavement.

The project included a pre-engineered steel truss bridge with wood decking and Corten steel over a dry run creek in the project area.

Funding of the project was with a Surface Transportation Project grant from the Iowa DOT.   The project was bid through a State letting.   Project design and construction services were  provided by Gibbs Engineering and Surveying, P.C. following State guidelines.

The City has extensively landscaped the trail and constructed a brick gateway structure to enhance the area and welcome people to the City.


Filed Under: Portfolio

Recreation Walkway

May 27, 2014 by itsadmin

Central City, Iowa

The City constructed a two-thirds mile long, 8-foot-wide concrete trail along the Wapsipinicon River in 2008.  The 5″ concrete pavement included about 3,200 square yards.

Benches were installed along the trail in convenient locations with two kiosks.  Decorative paving inserts and retaining wall were also included in the project.  The trail will ultimately connect to County trails originating in Pinicon Ridge Park.

Benches provide a scenic view of the Wapsipinicon River; decorative concrete draws trail users to the overlook.
Caption
Caption

Filed Under: Portfolio

Featured Projects

Street Improvements

Jacoby Walkway

View Our Portfolio

Contact Us:

Burrington Group
105 West Main St.
Manchester, IA 52057
(563) 927-2434
info@burringtongroup.com

Find Us:

Search This Website:

© Copyright 2016 Burrington Group · All Rights Reserved · Powered by ITS · Login